Skip to main content
. 2023 Dec 2;23:1344. doi: 10.1186/s12913-023-10367-0

Table 3.

The total working time (in minutes) used for medication management considering the number of visits per day analyzed with analysis of covariance (Sidak multiple comparisons)

Variable IG (n = 64) CG (n = 46)
Baseline (T1)
meana
(95% CI)
1-month (T2)
meana
(95% CI)
2-months (T3)
mean a
(95% CI)
Difference T2-T1
meana
(p-value)
Difference
T3-T1
meana
(p-value)
Baseline (T1)
meana
(95% CI)
1-month (T2)
meana
(95% CI)
2-months (T3)
meana
(95% CI)
Difference
T2-T1
meana
(p-value)
Difference
T3-T1
meana
(p-value)
The total working time used for medication management 54.2 (49.6–58.8) 40.8 (37.4–44.3) 34.9 (31.4–38.3) -13.4 (< 0.001)* -19.3 (< 0.001)* 75.2 (70.1–80.4) 65.0 (59.8–70.1) 74.3 (69.2–79.4) -10.2 (0.02)* -0.95 (0.992)

aFive-day Estimated Marginal Mean in minutes per group

Abbreviations: IG, Intervention Group; CG, Control Group; CI, Confidence Interval