Treatments applied to the free ammonia intoxicated reactors, HNR1, HNR2 and HNR3

Stage Phase Weeks Treatment
Process reconditioning I 0 (day 0–1) pH reduction with acetic acid (15 g_VS L−1 in total)
II 0 (days 2–5) and 1 Dilution with tap water at 37°C (25 mL L−1 d_feed−1)
III 2 to 3 Re-inoculation with LNR effluents (6.5 mL L−1 d_feed−1); Water dilution*
Process recovery / 4 to 7 Re-inoculation with LNR effluents (6.5 mL L−1 d_feed−1); Feeding with sugar beet pulp (0.5 → 2 g_VS L−1 d_feed−1); Water dilution*
Process stability test / 8 to 11 Feeding with sugar beet pulp (2 g_VS L−1 d_feed−1); Water dilution*

The reactors were fed on working days, usually five consecutive days (i.e., d_feed) per week; * inputs suspended in tap water at 37°C to reach a hydraulic retention time of 56 days (total fed volume: 25 mL L−1 d_feed−1); LNR: low nitrogen input reactor used as a reference reactor; VS: volatile solids