Skip to main content
. 2023 Oct 25;9:e1640. doi: 10.7717/peerj-cs.1640

Table 3. Comparison of reconstruction methods.

Reconstruction method PSNR SSIM Average time consumption/s
Conventional method 20.01 0.3211 /
AWAN 27.44 0.6988 4.8
HRNet 29.15 0.7423 2.3
Ours 38.16 0.9808 1.2