Skip to main content
. 2023 Nov 27;14:1241131. doi: 10.3389/fpsyg.2023.1241131

Table 3.

RT and strategy switching costs (M ± SD) under different conditions in Experiment 2 (N = 57).

Motivation UD repetition UD switching DU repetition DU switching Costs
High approach 2073.88 ± 449.52 2227.73 ± 476.25 2314.74 ± 561.83 2326.67 ± 572.71 165.78 ± 271.90
Low approach 2169.29 ± 486.63 2140.02 ± 424.84 2347.73 ± 602.67 2222.31 ± 527.38 −154.69 ± 360.81
Neutral 2176.25 ± 483.05 2250.54 ± 506.90 2316.44 ± 510.37 2228.80 ± 501.74 −13.34 ± 298.14
Low avoidance 2129.85 ± 447.12 2183.10 ± 483.50 2316.51 ± 546.19 2275.76 ± 520.09 12.50 ± 314.44
High avoidance 2080.42 ± 456.32 2292.65 ± 539.82 2301.13 ± 525.51 2293.68 ± 504.98 204.79 ± 463.30