Skip to main content
. 2023 Dec 20;23(12):1284–1302. doi: 10.1089/ast.2022.0055

Table 2.

Command Cycles Required to Accomplish the Drilling and Sample Delivery Operations

Hole Date Type Command cycles
Start up 0–10 cm 10–20 cm 20–30 cm 30–40 cm 40–50 cm 50–60 cm 60–70 cm 70–80 cm Shut down Total
Hole #0A September 13, 2019 In-Sim 3 5 3 2           2 15
Out-of-Sim   2                 2
Hole #0B September 13, 2019 In-Sim 2 3 3 16           4 28
Out-of-Sim   1 18               19
Hole #1 September 15, 2019 In-Sim 3 5 17             3 28
Out-of-Sim                      
Hole #1A September 16, 2019 In-Sim 3 5 8 10 5 8 10     3 52
Out-of-Sim                      
Hole #2 September 17, 2019 In-Sim 1 5 13 11 5 5 5     4 49
Out-of-Sim                      
Hole #3 September 18, 2019 In-Sim 1 5 5 5 5 5 5 5 20 2 58
Out-of-Sim                      
Hole #4 September 19, 2019 In-Sim 3 5 11 5 5 5 5     4 43
Out-of-Sim                      
Hole #5 September 20, 2019 In-Sim 5 2 2 5 3 2 5 2 15 2 43
Out-of-Sim                 67   67