Skip to main content
. 2023 Dec 12;13:1239636. doi: 10.3389/fonc.2023.1239636

Table 2.

The planning dose parameter.

Dose coverage Mean Max Min
PTV D99% (cGy) 4606.29 4871 4026
D98% (cGy) 4797.04 4949 4504
D95% (cGy) 4943.32 5055 4006
Dmean (cGy) 5216.07 5271 5155
D50% (cGy) 5236.10 5302 5169
D2% (cGy) 5440.28 5563 5303
Dmax (cGy) 5462.10 5605 5320
Dmean (cGy) 5216.07 5271 5155
HI 0.12 0.18 0.08
Spinal cord Dmax (cGy) 664.41 1570 72
Spinal cord PRV Dmax (cGy) 798.28 1634 78
Lung (ipsilateral) V30 (%) 16.31% 19.84% 0.00%
V20 (%) 21.66% 28.14% 0.00%
V5 (%) 46.10% 54.44% 4.37%
Dmean (cGy) 1198.68 1394.00 201.00
Heart V30 (%) 1.02 3.01 0.07
V40 (%) 0.22 0.89 0.00
Dmean (cGy) 395.40 442.00 339.00

D99%, D98%, D95%, D50% and D2% is the dose of 99%, 98%, 95%, 50% and 2% PTV volume respectively. PTV, planning target volume. PRV, planning risk volume. V5, V20, V30 and V40 is the percentage volume receiving 5,20,30,40 Gy, respectively. HI, homogeneity index, HI = D2%-D98%/D50%.