Costs for contracting different maximum power. Access costs covers the bureaucratic process, extension costs are linked to infrastructure use due to increased power and action costs are paid if a technician is required on site.

Tariff Access costs Extension costs Action costs
3.0TD 19.7 €/kW 17.4 €/kW 9 €/actuation
6.1TD 17.0 €/kW 15.7 €/kW 79 €/actuation