Table 3.
Costs for contracting different maximum power. Access costs covers the bureaucratic process, extension costs are linked to infrastructure use due to increased power and action costs are paid if a technician is required on site.
| Tariff | Access costs | Extension costs | Action costs |
|---|---|---|---|
| 3.0TD | 19.7 €/kW | 17.4 €/kW | 9 €/actuation |