Skip to main content
. 2024 Jan 2;14:83. doi: 10.1038/s41598-023-50404-w

Table 4.

Traffic survey records during the construction stage.

No. Date Time To 10th district (Veh./h) To 9th district (Veh./h)
1 9–12–2021 3:30 pm 1098 864
2 22–12–2021 6:40 pm 1440 840
3 28–12–2021 4:30 pm 1071 672
4 13–1–2022 6:15 pm 771 1260
5 18–1–2022 5:00 pm 1512 1128
6 26–1–2022 7:00 pm 1104 1040
7 1–2–2022 5:25 pm 1080 ––
8 10–2–2022 4:40 pm 1068 1680
9 16–2–2022 6:18 pm 1332 1050
10 24–2–2022 9:00 pm 1164 1224
11 1–3–2022 7:30 pm 1956 1000
12 9–3–2022 8:10 pm 1092 1500
13 15–3–2022 7:16 pm 1848 1380