The average traffic volume during each construction stage.
| Stages | Stages scope | Average traffic volume (veh./day) |
|---|---|---|
| 1 | Piles, pile cap, pier | 43,490 |
| 2 | Pier head | 39,140 |
| 3 | Beams erection and slabs | 28,440 |
| 4 | Newgersy and finishing | 32,708 |
The average traffic volume during each construction stage.
| Stages | Stages scope | Average traffic volume (veh./day) |
|---|---|---|
| 1 | Piles, pile cap, pier | 43,490 |
| 2 | Pier head | 39,140 |
| 3 | Beams erection and slabs | 28,440 |
| 4 | Newgersy and finishing | 32,708 |