Skip to main content
. 2024 Jan 10;291(2014):20231766. doi: 10.1098/rspb.2023.1766

Figure 2.

Figure 2.

Change in area of (a) a desiccating pond in Misungwi district, Kisima cha Longo (reduction of pond area of 100%) and (b) a non-desiccating pond in Busega district, Lambo la Wachina (reduction of pond area of 79.78%) within a survey year.