Skip to main content
. 2024 Jan 16;18:3. doi: 10.1186/s13037-023-00385-6

Fig. 6.

Fig. 6

Quantification of deviations using Mimics: the green line represents the planned drilling, the red line the realized drilling. ∆entry point is indicated in mm in green numbers, ∆exit point in mm in red numbers