Skip to main content
. 2023 Dec 14;12:639. Originally published 2023 Jun 12. [Version 2] doi: 10.12688/f1000research.133199.2

Figure 18. South-East office Base case direct sunlight simulation results, (A) January sunlight simulation, (B) April sunlight simulation, (C) July sunlight simulation, and (D) October sunlight simulation.

Figure 18.

The photos (A), (B), (C), and (D) were acquired from the researcher’s work on the case study office building using DesignBuilder software.