Skip to main content
. 2024 Jan;45(1):54–59. doi: 10.15537/smj.2024.45.1.20230684

Table 2.

- Epidemiological data.

Techniques Mechanisms Pre-op T (hours) OR T (minutes) Anesthesia
DHS HI-E (n=8) / Low-E (n=33) 99.5 (44-155) 75 (65-135) GA (n=8) S (n=33)
CHS HI-E (n=11) / Low-E (n=33) 105 (24-189) 80 (60-160) GA (n=12) S (n=32)

DHS: dynamic hip screws, CHS: cannulated hip screws, Pre-op T: preoperative waiting time until operation day, OR T: operation time, HI-E: high energy, Low-E: low energy, GA: general anesthesia, S: spinal, n: number