Skip to main content
. 2024 Jan 11;10(2):e24313. doi: 10.1016/j.heliyon.2024.e24313

Table 4.

Mix the proportion of high strength concrete.

Mix ID Binding and CF Materials (%)
Mass of constituents needed to Produce 1 m3 Concrete (kg)
PC WSA CF PC WSA CF FA CA Water
C 100 0 0 373 0 0 560 1120 180
WSA5CF1 95 5 1 354.35 18.65 20.53 560 1120 180
WSA5CF2 95 5 2 354.35 18.65 41.06 560 1120 180
WSA5CF3 95 5 3 354.35 18.65 61.59 560 1120 180
WSA5CF4 95 5 4 354.35 18.65 82.12 560 1120 180
WSA10CF1 90 10 1 335.70 37.30 20.53 560 1120 180
WSA10CF2 90 10 2 335.70 37.30 41.06 560 1120 180
WSA10CF3 90 10 3 335.70 37.30 61.59 560 1120 180
WSA10CF4 90 10 4 335.70 37.30 82.12 560 1120 180
WSA15CF1 85 15 1 317.05 55.95 20.53 560 1120 180
WSA15CF2 85 15 2 317.05 55.95 41.06 560 1120 180
WSA15CF3 85 15 3 317.05 55.95 61.59 560 1120 180
WSA15CF4 85 15 4 317.05 55.95 82.12 560 1120 180
WSA20CF1 80 20 1 298.40 74.60 20.53 560 1120 180
WSA20CF2 80 20 2 298.40 74.60 41.06 560 1120 180
WSA20CF3 80 20 3 298.40 74.60 61.59 560 1120 180
WSA20CF4 80 20 4 298.40 74.60 82.12 560 1120 180