. 2024 Feb 15;11(1):287–298. doi: 10.1089/3dp.2022.0044

Table 5.

Results on Test A

Specimen per build Time × build (h) Cmaterial (€ per piece) Clabor (€ per piece) Cacquisition (€ per piece) Cmaintenance (€ per piece) Cenergy (€ per piece) Cost per piece (€)
1 1.03 4.79 2.50 € 0.28 0.03 0.48 8.08 €
2 2.05 4.79 1.25 € 0.28 0.03 0.40 6.75 €
3 3.08 4.79 0.83 € 0.28 0.03 0.37 6.30 €
4 4.10 4.79 0.63 € 0.28 0.03 0.36 6.08 €
5 5.25 4.79 0.50 € 0.29 0.03 0.36 5.96 €
6 6.27 4.79 0.42 € 0.29 0.03 0.35 5.87 €
7 7.30 4.79 0.36 € 0.29 0.03 0.35 5.81 €
8 8.32 4.79 0.31 € 0.28 0.03 0.34 5.76 €
9 9.35 4.79 0.28 € 0.28 0.03 0.34 5.72 €
10 10.48 4.79 0.25 € 0.29 0.03 0.34 5.70 €
11 11.52 4.79 0.23 € 0.29 0.03 0.34 5.67 €
12 12.53 4.79 0.21 € 0.29 0.03 0.34 5.65 €