Ultrasonic wave velocity (cp) calculated on the basis of transit times recorded (acc. to procedure described in EN 12504-4:2021 standard [43]) 14 days and 3 years after concrete preparation.

Concrete Symbol Ultrasonic Wave Velocity, cp
After 28 Days After 3 Years Change
Mean [m/s] SD
[m/s]
CV
[%]
Mean [m/s] SD
[m/s]
CV
[%]
Δcp
[%]
OC 5070 82 1.6 5020 101 2.0 −1.0
SAP-25 5047 38 0.8 5152 211 4.1 2.1
SAP-50 4947 42 0.8 4958 107 2.2 0.2
SAP-50s 5043 55 1.1 5475 100 1.8 8.6
SAP-75 4727 111 2.3 4940 70 1.4 4.5