Table 15.

Simulation results of study cases 7, 8, 9 and 10.

Case No. Objectives Cost ($/h) Emission(t/h) VD (p.u.) Loss (MW)
Case 7 Cost 41 756 1.5509 1.2404 14.338
Emission 44 480 1.1391 1.1096 15.463
BCS 41 786 1.5146 1.1839 13.865
Case 8 Cost 41 644 1.9326 2.3523 14.153
VD 41 737 1.9545 0.69649 16.805
BCS 41 695 1.9011 0.89139 15.463
Case 9 Cost 41 902 1.6398 0.82315 12.538
Loss 43 462 1.3469 0.74643 10.99
VD 43 274 1.3756 1.3522 10.316
BCS 42 070 1.5218 1.0309 11.559
Case 10 Cost 42 322 1.4119 0.95998 12.164
Emission 43 301 1.256 0.81109 12.392
VD 43 173 1.3702 0.77072 11.134
Loss 43 831 1.3502 1.3033 10.267
BCS 43 419 1.3559 1.2405 10.413

*Bold values represent the best values.