Case No. Objectives Cost ($/h) Emission(t/h) VD (p.u.) Loss (MW)
Case 1 Cost 782.68 1.7606 0.53868 5.687
Emission 903.11 0.0923 0.49100 2.2178
BCS 861.85 0.0975 0.49609 2.856
Case 2 Cost 782.58 1.8274 0.61063 5.6799
VD 917.06 0.9328 0.37556 5.4192
BCS 792.63 1.8016 0.40204 6.4101
Case 3 Cost 782.86 1.7591 0.43641 5.8161
Emission 868.19 0.0962 0.45634 2.8986
Loss 874.38 0.09811 0.46611 2.2386
BCS 856.44 0.1100 0.43785 2.7762
Case 4 Cost 786.00 1.5524 0.47125 6.0239
Emission 880.28 0.0935 0.96126 2.3234
VD 901.08 0.16218 0.39132 3.6779
BCS 859.97 0.0981 0.70973 2.8134
Case 5 Cost 783.47 1.8383 0.41981 6.0369
VD 927.38 0.1607 0.39728 3.4234
Loss 866.96 0.1091 0.41714 1.8449
BCS 801.12 0.8102 0.45371 4.8642
Case 6 Cost 782.81 1.8001 0.4292 5.9225
Emission 902.75 0.0930 0.64208 2.0771
VD 809.84 2.4315 0.39552 6.4254
Loss 943.36 0.0954 0.43402 1.9564
BCS 860.27 0.1023 0.61484 2.638