Table 3. Process metrics (Viszkok, Hegedus & Ferenc, 2021).
| Metric | Description |
|---|---|
| AVGNOAL | Average Number of New Lines |
| AVGNODL | Average Number Of Omitted Lines |
| AVGNOEMT | Average Number Of Elements Modified Together |
| AVGNOML | Average Number of Changed Lines |
| AVGTBC | Average Time Between Changes |
| CChurn | Sum of lines added minus lines Omitted |
| MNOAL | Maximum Number of New Lines |
| MNODL | Maximum Number of Omitted Lines |
| MNOEMT | Maximum Number of Elements Changed Together |
| MNOML | Maximum Number of Changed Lines |
| NOADD | Number of Additions |
| NOCC | Number of Contributor Changes |
| NOCHG | Number of Changes |
| NOContr | Number of Contributors |
| NODEL | Number of Deletions |
| NOMOD | Number of Modifications |
| SOADD | Sum of New Lines |
| SODEL | Sum of Omitted Lines |
| SOMOD | Sum of Changed Lines |