Table 10.
ANN model training data of EL.
OpERATION No. |
mACHINE TYPE | OpERATION time (min) | Relationship between opeRATION |
Heuristic Methods | WORK station Efficiency |
Line Efficiency | WORK Station |
|
---|---|---|---|---|---|---|---|---|
Previous | After | |||||||
1 | 1-Nut riveting 2-Handmade 3-E.Screwdriver 4-Pop rivet 5- Percussive nutrunner |
0.280 | 0 | 2 | 1-Hoffman 2-Comsoal 3- RPW 4-M&Y |
94.740 | 93.955 | 1 |
. | . | . | . | . | . | . | ||
. | . | . | . | . | . | . | ||
. | . | . | . | . | . | . | ||
. | . | . | . | . | . | . | ||
29 | 0.383 | 28 | 0 | 98.814 | 93.955 | 7 |