Line balancing results.

Workstation Number Operation No Machine Type Time (min.) Total Time for Workstation (x) Remaining Time (C-x)
1 1 Nut Riveting 0.280 1.262 0.071
2 Handmade 0.105
7 Handmade 0.046
13 Handmade 0.098
18 Nut riveting 0.600
21 Handmade 0.133
2 3 E. screwdriver 0.372 1.340 0.010
8 Handmade 0.331
14 Handmade 0.396
16 E. screwdriver 0.241
3 4 PPM 0.287 1.341 0.009
9 Handmade 0.366
15 Handmade 0.550
22 Handmade 0.138
4 5 E. screwdriver 0.334 1.256 0.094
17 Handmade 0.466
19 E. screwdriver 0.376
11 E. screwdriver 0.080
5 6 E. screwdriver 0.305 1.349 0.001
20 Handmade 0.366
26 Handmade 0.678
6 10 Handmade 1.333 1.333 0.017
7 12 E. screwdriver 0.816 1.334 0.016
28 Handmade 0.135
29 E. screwdriver 0.383
8 23 Pop rivet 0.743 0.743 0.607
9 24 E. screwdriver 0.700 1.300 0.050
27 E. screwdriver 0.600
10 25 Handmade 0.733 0.733 0.617
Total Time 12.684 12.684 1.509