1 3 0.280 3 4 0.372
2 4 0.105 4 3 5 0.287
3 1 4 0.372 5 4 6 0.334
4 2–3 5 0.287 6 5 10 0.305
5 4 6 0.334 8 9 0.331
6 5 10 0.305 9 8 10 0.366
7 8 0.046 10 6–9 11 1.333
8 7 9 0.331 11 10 12 0.080
9 8 10 0.366 12 11 24 0.816
10 6–9 11 1.333 14 15 0.396
11 10 12 0.080 15 14 17 0.550
12 11 24 0.816 16 17 0.241
13 14 0.098 17 15–16 23 0.466
14 13 15 0.396 19 20 0.376
15 14 17 0.550 20 19 21 0.366
16 17 0.241 21 20 22 0.133
17 15–16 23 0.466 22 21 23 0.138
18 19 0.600 23 17–22 24 0.743
19 18 20 0.376 24 12–23 25 0.700
20 19 21 0.366 25 24 26 0.733
21 20 22 0.133 26 25 27 0.678
22 21 23 0.138 27 26 28 0.600
23 17–22 24 0.743 28 27 29 0.135
24 12–23 25 0.700 29 28 0.383
25 24 26 0.733
26 25 27 0.678
27 26 28 0.600
28 27 29 0.135
29 28 0.383