Table 2.
Optimal trip-oriented PMS, fleet sizing, and charge scheduling algorithm.
| Algorithm: Optimal trip-oriented PMS, fleet sizing, and charge scheduling [, ] | ||
|---|---|---|
| 1 | Inputs | Route and driveline characteristics |
| , Eqs. (1)–(4) | ||
| 2 | Initialize | Representative driving cycle and significant speed profile clusters |
| , , | ||
| 3 | Solve | Optimal route-oriented power management problem, Eq. (14) |
| Using NSGA-II (10 levels for over 10 generations) | ||
| find achieving | ||
| interim Output , | ||
| 4 | Initialize | Headway requirements, Eq. (14) |
| , | ||
| 5 | Solve | Optimal fleet sizing and charge scheduling problem, Eq. (25) |
| Using NSGA-II (10 levels for over 10 generations ) | ||
| find achieving | ||
| interim Output , | ||
| Outputs optimal PMS, fleet size, and charge schedule and | ||