Skip to main content
. 2024;78(1):33–38. doi: 10.5455/medarh.2024.78.33-38

Table 2. Correlation between S.T.O.N.E score and the operation time (OR), the stone clearance rate (SCR.

S.T.O.N.E score N OR P-value SCR (%) P-value
Stone-free Residual stone
6 17 44.7±13.3 0.000 17 (100) 0 0.001
7 16 55.6±13.9 15 (93.8) 1(6.2)
8 13 63.5±17.2 11 (84.6) 2 (15.4)
9 8 65.6±27.8 6 (75) 2 (25)
10 9 97.3±43.4 5(55.6) 4(44.4)
11 5 98.0±31.9 3 (60) 2(40)
12 3 141.7±22.5 2 (66.7) 1(33.3)
N 71 67.5±32.8 56(78.9) 15(21.1)