Skip to main content
. 2023 Oct 13;13(2):98–119. doi: 10.1055/s-0043-1775820

Fig. 16.

Fig. 16

( A ) View from the 6R portal. The hole for the first anchor is drilled through the VR portal in the detached area of the radius. ( B ) The threads remain inside the VR portal. ( C ) The knot pusher is introduced from the 3/4 portal. It is advanced into the VR portal and loaded with the threads of the anchor. ( D ) The threads are retrieved to the 3/4 portal. ( E and F ) The second anchor is placed ulnar to the first one.