Skip to main content
. 2024 Mar 16;10(6):e27981. doi: 10.1016/j.heliyon.2024.e27981

Table 3.

Attributes, attributes level, and descriptions.

Attributes Level Descriptions
Types of renewable energy (TORE) Solar photovoltaic Preference for solar photovoltaic generation to support the government target to achieve 40% of renewable energy installed capacity by 2035 under the FiT.
Biomass Preference of biomass generation to support the government target to achieve 40% of renewable energy installed capacity by 2035 under the FiT.
Biogas Preference of biogas generation to support the government target to achieve 40% of renewable energy installed capacity by 2035 under the FiT.
Small hydropower Preference for small hydropower generation to support the government target to achieve 40% of renewable energy installed capacity by 2035 under the FiT.
Project Location (PL) Unchanged Renewable energy project plants remain located in Pasir Gudang and Pengerang.
Near Renewable energy project plants are close to the factories.
Far Renewable energy project plants are far from the factories.
Annual reduction of GHG emission (GHG) 29.4% Reduction of GHG emissions in 2005.
36.69% Average reduction in GHG emissions from 2005 to 2030.
45.0% The government's target is to reduce carbon emissions by 45% in 2030.
Monthly Renewable Energy Fund
(RE FUND)
1.6% Maintain the current renewable energy fund charged to manufacturing sectors.
2.2% Increase by 0.6% from the current charge.
2.8% Increase by 1.2% from the current charge.