Skip to main content
. 2024 Mar 4;14(3):2514–2527. doi: 10.21037/qims-23-1143

Table 4. The fitted function.

Variable Estimate Std.Error t value Pr (>|t|)
PC1 0.122 0.016 7.780 1.2e−11
PC2 −0.173 0.040 −4.320 4.0e−05
PC3 −0.111 0.048 −2.290 0.03
PC4 −0.051 0.055 −0.930 0.36
Intercept 0.516 0.038 13.660 <2e−16

PC, principal component.