Skip to main content
. 2024 Mar 19;10:e48738. doi: 10.2196/48738

Figure 2.

Figure 2

The Synthesis tab of the Shiny app, which includes the consensus estimate and a forest plot of the prior, the estimates, and the consensus estimate as well as the unaccounted-for variation. For the estimates in the forest plot (black), the solid lines represent the unscaled 95% CI, whereas the dotted lines represent the confidence-scaled 95% CI.