Skip to main content
. 2024 Mar 25;3(4):pgae127. doi: 10.1093/pnasnexus/pgae127

Fig. 3.

Fig. 3.

Accumulative power capacities for generation and storage power capacities in different scenarios. The CP and IG scenarios, though unrealistic, indicate the minimum and maximum capacities and costs. The AEM scenario has the lowest realistic investment cost, which is about A$5.3 billion less than the BAU scenario. After wind generation, the bulk of investment is required for deep storage.