Fig. 4.

Fig. 4.

Power capacities required for each region under three scenarios. The NSW and QLD regions have the highest demand and therefore need over 25 GW of generation and storage capacities each. The TAS region does not need any storage due to the abundance of hydro generation capacity, while for TAS to have an RE100 grid, around 180 MW of wind needs to be installed.