Table 1.
Reliability and validity analysis of indicators affecting drilling task performance.
Variable | Indicator | Cronbach’s alpha | KMO | Bartlett’s test (P) | Number of indicators |
---|---|---|---|---|---|
Human | Teamwork | 0.807 | 0.709 | 0.000 | 7 |
Clear assignment of tasks | |||||
Operation training | |||||
Personal safety awareness | |||||
Personal responsibility consciousness | |||||
Drilling experience | |||||
Engineering construction experience | |||||
Tool | Fault and overload warning | 0.847 | 0.740 | 0.000 | 9 |
Use safety | |||||
Sufficient protective tools | |||||
Easy replacement of parts | |||||
Sufficient vulnerable parts | |||||
Man-aided design | |||||
Man–machine adaptive design | |||||
Sufficient equipment types | |||||
Intact function and appearance | |||||
Environment | Less dust | 0.845 | 0.712 | 0.000 | 11 |
Clean construction site | |||||
Good air quality | |||||
No noise hazard | |||||
Bright light | |||||
Emergency plan and drill | |||||
Sufficient protective materials | |||||
Injury report and timely treatment | |||||
Reasonable safety system | |||||
Reasonable project schedule | |||||
Safety inspection and hidden danger investigation | |||||
Total scale | 0.920 | – | – | 27 |