Table 2.
G4G 2.0 programme requirements with benchmarks and results from two sites

PR, programme requirement.
*NA = data not collected.
†NA = not applicable due to review time period.
‡NA = not provided to site.
Scored sections = Green or red highlight; green highlight = PR compliance at or above benchmark; red highlight = PR compliance below benchmark.
Site 1 and Site 2A: PFA conducted immediately after G4G 2.0 implementation; Site 2B: PFA conducted 3 months after G4G implementation.