Table 2.
Base case results (2-year time horizon).
| Strategy | Total Costs | Incremental Costs |
|---|---|---|
| IPE | 12,688 (10,490 to 15,143) | Reference |
| RPM-Conventional | 12,001 (9,955 to 14,293) | −687 (−2,138 to +638) |
| RPM-Alert | 11,011 (8,981 to 13,298) | −1,677 (−3,134 to −304) |
| Preferred Strategy | RPM-Alert: Cost Savings | |