Skip to main content
. 2024 May 13;24(10):3085. doi: 10.3390/s24103085

Table 9.

Comparisons of computational costs (ms).

Schemes Hu et al. [5] Garg et al. [33] Sureshkumar et al. [7] Aghapour et al. [10] Ours
NG, SP 4Tm+5Th 3Tm+4Th+1Te 3Tm+6Th 4Th 5Th
=112.18 =84.328 =84.162 =0.048 =0.06
Smart Meter(SM) 4Tm+5Th 3Tm+4Th+1Te 1Tm+4Th 4Th 5Th
=112.18 =84.328 =28.078 =0.048 =0.06
Total 8Tm+10Th 6Tm+8Th+2Te 4Tm+10Th 8Th 10Th
=224.36 =168.656 =112.24 =0.096 =0.12