Skip to main content
. 2024 May 10;10(10):e31025. doi: 10.1016/j.heliyon.2024.e31025

Table 8.

Optimal configurations for all chosen regions, each with final decision indicators.

Configurations Sites Cost and objective parameter Solar Energy Grid Renewable fraction E. E
NPC COE ICC OPC Purchase Sale %
$ $ $ $/yr kWh/yr kWh kWh % kWh/yr
PV-B
Peshawar 31,501 0.321 15,021 762 13,859 100 63.5
Khyber Agency 88,030 0.348 49,950 1762 99,837 100 86.2
Mardan 113,357 0.354 68,236 2088 64,442 100 75.1
Charsadda 158,212 0.463 93,601 2989 109,651 100 84.5
PV + G(P)
Peshawar 9763 0.097 3524 288 5227 1519 67.4 28.5
Khyber agency 24,555 0.095 8377 749 12,465 4073 65.4 26.5
Mardan 30,721 0.096 9869 965 14,778 5452 63.2 24.3
Charsadda 41,444 0.114 10,558 1429 15,571 8559 49 28.7
PV + G(P + S)
Peshawar 7908 0.056 3585 200 5229 1504 1778 76.6 0.56
Khyber Agency 20,186 0.059 8462 542 12,466 4036 4066 74.5 0.35
Mardan 25,826 0.061 9951 734 14,780 5423 4571 72 0.35
Charsadda 34,487 0.068 10,631 1104 15,566 8536 6482 63.3 0.30
PV-DG
Peshawar 68,429 0.709 38,546 1383 59,194 65.6 92.3
Khyber Agency 117,668 0.463 45,251 3350 66,185 60.4 82.8
Mardan 152,729 0.533 56,857 4964 81,904 53.6 82.8
Charsadda 270,548 0.746 102,534 7773 138,584 34 88.4
G
Peshawar 13,914 0.138 644 4665
Khyber Agency 35,068 0.138 1622 11,757
Mardan 44,224 0.138 2046 14,826
Charsadda 50,027 0.138 2315 16,772