Skip to main content
. 2024 May 14;16(20):25610–25621. doi: 10.1021/acsami.3c17384

Figure 3.

Figure 3

(A) Phase-contrast images of the generation process of spheroids over 11 days. Scale bar: 50 μm. (B) Growth curve of spheroids over 11 days. Spheroid diameter (μm) was plotted against culture time (days). Data are presented as mean ± standard error (n = 100 spheroids).