Table 1.
ID/No. | Location Name | Results(dB) | EEL4/94 Limits/8hrs |
---|---|---|---|
Control Rooms &Offices | |||
#2 | Security Office | 50.8 | >70 dB (High) <70 dB (Low) |
#3 | Camp Area | 58.2 | |
#7 | Clinic | 53.0 | |
#8 | New Admin Office | 69.5 | |
#23 | Power Plant Office | 69.8 | |
#37 | Plant Control room | 69.0 | |
#38 | Crusher Control Room | 62.4 | |
#39 | Process and Mining Office | 55.3 | |
Work Environment | |||
#1 | Main Road | 50.1 | >90 dB (High) <90 dB (Low) |
#4 | Batch Plant Area | 71.0 | |
#5 | LV Workshop | 75.2 | |
#6 | Warehouse | 56.2 | |
#9 | Mining Check Point | 64.0 | |
#10 | Drill Pattern | 91.0 | |
#11 | Digging Face | 82.2 | |
#12 | Blast Pattern | 76.4 | |
#13 | Room Pad | 69.5 | |
#14 | Waste Dump-Grade Control Area | 65.6 | |
#15 | Waste Dump-Pit Containers Offices | 60.4 | |
#16 | Underground Area 1(740 Access) | 91.4 | |
#17 | Underground Area 2 (Tagboard 770) | 102.5 | |
#18 | Underground Area 3 | 89.5 | |
#19 | Mobile Maintenance Workshop | 76.6 | |
#20 | Area In front of the power plant | 85.6 | |
#21 | Power Generators House | 107.0 | |
#22 | Power station stacks Area | 95.6 | |
#24 | Inside Laboratory (Sample Preparation) | 67.4 | |
#25 | Outside laboratory | 78.8 | |
#26 | Carbon Regeneration area | 77.1 | |
#27 | Air Compressor Area | 100.4 | |
#28 | Plant Workshops | 72.1 | |
#29 | Mills Area | 97.8 | |
#30 | Cyanide Area | 80.2 | |
#31 | Floatation Tank Area | 80.6 | |
#32 | Gold Room | 61.7 | |
#33 | Carbon Leaching Tank Area 1 | 85.4 | |
#34 | Carbon Leaching Tank Area 2 | 85.9 | |
#35 | At Regrind Area | 79.2 | |
#36 | At Lime Area | 84.3 |