ID/No. | Location Name | PM10 Results |
EEL4/94 Limits |
---|---|---|---|
AMBIENT ENVIRONMENT (Time exposure 24 h) | |||
#1 | Main Road | 85 | >150 μg/m3(High) <150 μg/m3(Low) |
#3 | Camp Area | 93 | |
Work Environment (Time Exposure 8 Hrs.) | |||
#2 | Security Office | 1.26 | >3 mg/m3(High) <3 mg/m3(Low) |
#4 | Batch Plant Area | 0.58 | |
#5 | LV Workshop | 0.77 | |
#6 | Warehouse | 0.85 | |
#7 | Clinic | 0.09 | |
#8 | New Admin Office | 0.08 | |
#9 | Mining Check Point | 0.98 | |
#10 | Drill Pattern | 1.51 | |
#11 | Digging Face | 0.59 | |
#12 | Blast Pattern | 0.39 | |
#13 | Room Pad | 0.25 | |
#14 | Waste Dump-Grade Control Area | 0.37 | |
#15 | Waste Dump-Pit Containers Offices | 0.47 | |
#16 | Underground Area 1(740 Access) | 4.6 | |
#17 | Underground Area 2 (Tagboard 770) | 3.8 | |
#18 | Underground Area 3 | 3.6 | |
#19 | Mobile Maintenance Workshop | 0.4 | |
#20 | Area In front of the power plant | 0.37 | |
#21 | Power Generators House | 0.99 | |
#22 | Power station stacks Area | 0.99 | |
#23 | Power Plant Office | 0.89 | |
#24 | Inside Laboratory (Sample Preparation) | 4.2 | |
#25 | Outside laboratory | 1.98 | |
#26 | Carbon Regeneration area | 0.45 | |
#27 | Air Compressor Area | 0.86 | |
#28 | Plant Workshops | 0.99 | |
#29 | Mills Area | 0.37 | |
#30 | Cyanide Area | 0.20 | |
#31 | Floatation Tank Area | 0.27 | |
#32 | Gold Room | 0.99 | |
#33 | Carbon Leaching Tank Area 1 | 0.12 | |
#34 | Carbon Leaching Tank Area 2 | 0.18 | |
#35 | At Regrind Area | 0.89 | |
#36 | At Lime Area | 1.10 | |
#37 | Plant Control room | 0.20 | |
#38 | Crusher Control Room | 0.25 | |
#39 | Process and Mining Office | 0.35 |