Table 3.
ID/No. | Location Name | CO | SO2 | NO2 | HCN | NH3 | PM10 | HI | Risk Rating |
---|---|---|---|---|---|---|---|---|---|
Work Environment EEL Limit (PPM) | 25 | 3 | 2 | 4.7 | 25 | 3 mg/m3 | >1 High <1 Low |
Low(L) Medium(M) High(H) |
|
Ambient Environment EEL Limit(μg/m3) | 400 | 350 | NIL | NIL | NIL | 150 | |||
Ambient Environment (Time exposure 24 h) | |||||||||
#1 | Main Road | 0.27 | 0.1 | 0.1 | 0 | 0.1 | 85 | 0.0015 | L |
#3 | Camp Area | 0.1 | 0 | 0 | 0 | 0 | 93 | 0.0003 | L |
Work Environment (Time Exposure 8 Hrs.) | |||||||||
#2 | Security Office | 0.24 | 0 | 0 | 0 | 0 | 1.26 | 0.01 | L |
#4 | Batch Plant Area | 0.1 | 0.1 | 0.6 | 0 | 0 | 0.58 | 0.34 | L |
#5 | LV Workshop | 0.72 | 0.1 | 0.4 | 0 | 2.75 | 0.77 | 0.37 | L |
#6 | Warehouse | 0.36 | 0 | 0 | 1 | 0 | 0.85 | 0.23 | L |
#7 | Clinic | 0.1 | 0 | 0 | 0 | 0 | 0.09 | 0.00 | L |
#8 | New Admin Office | 0.5 | 0 | 0 | 0 | 0 | 0.08 | 0.02 | L |
#9 | Mining Check Point | 0.1 | 0 | 0.1 | 0 | 1 | 0.98 | 0.09 | L |
#10 | Drill Pattern | 1.2 | 0 | 0.1 | 0 | 0 | 1.51 | 0.10 | H |
#11 | Digging Face | 0.8 | 0 | 0.1 | 0 | 0 | 0.59 | 0.08 | L |
#12 | Blast Pattern | 1.3 | 0 | 0 | 0 | 1 | 0.39 | 0.09 | L |
#13 | Room Pad | 0.35 | 0 | 0 | 0 | 0 | 0.25 | 0.01 | L |
#14 | Waste Dump-Grade Control Area | 0.92 | 0 | 0 | 0 | 0 | 0.37 | 0.04 | L |
#15 | Waste Dump-Pit Containers Offices | 0.12 | 0 | 0 | 0 | 0 | 0.47 | 0 | L |
#16 | Underground Area 1(740 Access) | 6 | 0.37 | 1.9 | 7 | 23.67 | 4.6 | 3.75 | H |
#17 | Underground Area 2 (Tagboard 770) | 3.91 | 0.23 | 1.8 | 6 | 15.7 | 3.8 | 3.04 | H |
#18 | Underground Area 3 | 2.8 | 0.12 | 1.6 | 5 | 7 | 3.6 | 2.30 | H |
#19 | Mobile Maintenance Workshop | 2.9 | 0.1 | 0 | 0 | 0 | 0.4 | 0.15 | L |
#20 | Area In front of the power plant | 0 | 0.1 | 0.1 | 0 | 4.67 | 0.37 | 0.27 | L |
#21 | Power Generators House | 2.9 | 0.1 | 0.1 | 0 | 10 | 0.99 | 0.60 | L |
#22 | Power station stacks Area | 2.8 | 0.1 | 0.1 | 0 | 4 | 0.99 | 0.36 | H |
#23 | Power Plant Office | 0.1 | 0 | 0 | 0 | 0 | 0.89 | 0.00 | L |
#24 | Inside Laboratory (Sample Preparation) | 0.5 | 0.1 | 0.1 | 0 | 1 | 4.2 | 0.14 | H |
#25 | Outside laboratory | 0.6 | 0 | 0.1 | 0 | 1 | 1.98 | 0.11 | L |
#26 | Carbon Regeneration area | 2.2 | 0.1 | 0.1 | 0 | 1 | 0.45 | 0.21 | L |
#27 | Air Compressor Area | 0.1 | 0.1 | 0 | 0 | 2 | 0.86 | 0.12 | H |
#28 | Plant Workshops | 2.1 | 0.1 | 0.3 | 0 | 0 | 0.99 | 0.27 | L |
#29 | Mills Area | 1.5 | 0.1 | 0.5 | 0 | 2 | 0.37 | 0.42 | H |
#30 | CN Area | 0.1 | 0 | 0.3 | 1 | 3 | 0.20 | 0.49 | L |
#31 | Floatation Tank Area | 1.37 | 0 | 0.9 | 4 | 1 | 0.27 | 1.40 | L |
#32 | Gold Room | 0.47 | 0.1 | 0.9 | 0.1 | 2.8 | 0.99 | 0.64 | L |
#33 | Carbon Leaching Tank Area (1) | 2.1 | 0.1 | 1.9 | 5.5 | 15.5 | 0.12 | 2.86 | H |
#34 | Carbon Leaching Tank Area (2) | 3.9 | 0.1 | 0.7 | 5.4 | 14 | 0.18 | 2.25 | H |
#35 | At Regrind Area | 2.1 | 0.1 | 0.5 | 0 | 4 | 0.89 | 0.53 | L |
#36 | At Lime Area | 0.1 | 0 | 0.1 | 0 | 1 | 1.10 | 0.09 | M |
#37 | Process Plant Control | 2.1 | 0.1 | 0.2 | 0 | 1 | 0.20 | 0.26 | L |
#38 | Crusher Control Room | 0.1 | 0.1 | 0.2 | 0 | 0 | 0.25 | 0.14 | L |
#39 | Process & Mining Office | 0.1 | 0 | 0.1 | 0 | 1 | 0.35 | 0.09 | L |