Skip to main content
. 2024 Jun 4;15:4745. doi: 10.1038/s41467-024-48781-5

Fig. 7. Prevalence of specific network construction steps among the 8 optimal pipelines.

Fig. 7

Pie charts demonstrate, for each network construction step, the proportion and absolute number of each option that is found among the optimal pipelines. FD fixed density, GSR global signal regression, OMST orthogonal minimal spanning tree, SDM structural density. See Fig. S31 for a version of this figure with a breakdown of the pipelines under the more liberal PDiv criterion. Illustration of parcellations adapted from refs. 34 and 44.