Skip to main content
. 2022 May 26;1(2):100029. doi: 10.1016/j.jacadv.2022.100029

Table 2.

Accumulated Total Costs

MBTTS (n = 148) RVPAS (n = 154) P Value
Total costs
 1 y $701,260 ± 442,081 $804,062 ± 615,068 0.10
 3 y $864,071 ± 640,518 $978,333 ± 920,990 0.21
 5 y $996,437 ± 828,270 $1,105,594 ± 1,040,145 0.32
Total daily costs
 1 y $5,613 ± 8,265 $6,596 ± 10,990 0.38
 3 y $4,967 ± 85,554 $5,877 ± 11,268 0.43
 5 y $4,912 ± 8,579 $5,784 ± 11,300 0.45

Values are mean ± SD in US$.

MBTTS = modified Blalock-Taussig-Thomas shunts; RVPAS = right ventricle to pulmonary artery shunts.