Figure 8.
Visualization of ShapeDD. 1. Compute MMD for all time points (, dotted line shows theoretically expected shape σ, red line indicated time point of drift), 2. Match obtained shape with theoretically expected one (), 3. Candidate points are where the match score changes from positive to negative (black line is 0, dots mark candidates), and 4. Compute p-values using MMD test at candidate points.