Skip to main content
. 2024 Jul 8;14:15652. doi: 10.1038/s41598-024-66644-3

Table 11.

Optimal generation schedule for minimization of operating cost for Case-III (uncoordinated charging).

Hour Pd(kW) Ppv(kW) Pwt(kW) Pmt(kW) PFC(kW) PBatt(kW) Pgrid(kW)
1 52 0 2.39 29.99 22.5 − 30 59.99
2 50 0 2.42 29.99 5 − 18.91 60
3 50 0 2.51 29.75 21.52 − 27.75 57.25
4 51 0 2.48 29.62 28.3 − 27.75 50.16
5 56 0 2.44 29.64 21.88 − 20 54.75
6 63 0 1.22 29.99 30.99 − 31.99 59.99
7 70 0 2.43 29.99 31.65 − 19.72 59.99
8 75 0 2.37 29.99 30.55 − 32.97 59.99
9 76 4.29 4.99 29.91 34.99 58.91 − 11.92
10 80 7.51 10.55 29.82 37.75 59.34 − 19.93
11 78 10.31 19.25 29.82 36.51 59.34 − 19.99
12 74 19.25 22.55 29.74 46.73 44.21 − 23.29
13 72 22.65 27.72 29.74 34.2 47.23 − 17.56
14 72 21.99 22.61 28.63 35.25 47.23 − 21.78
15 76 13.25 10.12 28.59 37.61 59.91 − 19.97
16 80 4.99 7.43 28.67 36.25 59.32 − 18.02
17 85 1.43 2.55 29.89 32.55 60 − 7.99
18 88 0 2.43 29.75 32.46 60 90.02
19 90 0 2.35 29.99 32.41 60 90.02
20 87 0 2.53 29.99 32.52 60 90.02
21 78 0 2.31 29.99 32.48 60 81.75
22 71 0 2.36 29.99 32.53 60 77.62
23 52 0 2.12 29.99 32.47 33.28 70.19
24 50 0 1.55 29.99 32.63 0 59.99