Table 12.

Optimal generation schedule for minimization of operating cost for Case-III (coordinated charging).

Hour Pd(kW) Ppv(kW) Pwt(kW) Pmt(kW) PFC(kW) PBatt(kW) Pgrid(kW)
1 52 0 2.41 29.98 22.4 − 29.99 60
2 50 0 2.41 29.98 21.78 − 29.99 59.02
3 50 0 2.41 29.79 22.75 − 27.86 57.29
4 51 0 2.41 29.65 28.75 − 22.79 50.11
5 56 0 2.41 29.67 9.88 − 9.16 57.18
6 63 0 1.24 29.98 31.11 − 29.97 60
7 70 0 2.43 29.98 32.08 − 21.09 60
8 75 0 2.38 29.98 30.78 − 17.93 60
9 76 4.29 5.11 29.89 37.41 58.94 − 18.92
10 80 7.51 10.57 29.81 38.72 57.98 − 18.92
11 78 10.31 19.33 29.79 41.12 51.92 − 20
12 74 19.25 22.47 26.72 56.72 56.94 − 25.29
13 72 22.65 27.72 24.74 32.11 40.03 − 22.98
14 72 21.99 22.63 18.23 39.27 57.93 − 17.99
15 76 13.25 10.14 23.39 36.78 59.96 − 24.39
16 80 4.99 7.39 28.67 35.75 59.48 − 17.79
17 85 1.43 2.53 29.89 32.49 59.99 − 4.99
18 88 0 2.41 29.75 31.24 59.99 − 3.28
19 90 0 2.34 29.94 30.89 2.13 60
20 87 0 2.57 29.94 30.02 59.99 − 4.82
21 78 0 2.32 29.94 30.91 59.99 80.93
22 71 0 2.34 29.94 30.34 59.99 77.18
23 52 0 2.13 29.94 30.31 25.78 70.21
24 50 0 1.53 29.98 30.12 0 60