Skip to main content
. 2024 Jul 8;14:15652. doi: 10.1038/s41598-024-66644-3

Table 13.

Optimal generation schedule for minimization of operating cost for Case-III (smart charging).

Hour Pd(kW) Ppv(kW) Pwt(kW) Pmt(kW) PFC(kW) PBatt(kW) Pgrid(kW)
1 52 0 2.44 30 22.78 − 30 60
2 50 0 2.44 30 20 − 30 60
3 50 0 2.44 28.39 5.12 − 7.98 58.13
4 51 0 2.44 30 32.12 − 5.48 60
5 56 0 1.29 30 32.12 − 1.28 60
6 63 0 2.43 30 31.78 − 29.99 60
7 70 0 2.09 30 31.29 − 21.18 60
8 75 0 2.43 30 33.13 − 17.89 60
9 76 5.15 2.39 29.12 32.78 59.02 − 19.18
10 80 7.63 6.99 28.29 37.01 56.29 − 17.28
11 78 10.09 18.98 23.91 45.12 51.18 − 21.89
12 74 12.89 21.99 18.12 49.14 47.12 − 24.71
13 72 24.92 28.19 27.97 51.29 49.12 − 27.89
14 72 20.18 22.87 30 44.89 49.89 − 30
15 76 9.12 10.09 28.92 38.19 57.92 − 19.94
16 80 5.23 7.59 30 32.01 59.78 − 9.83
17 85 1.46 2.71 30 31.29 60 − 3.75
18 88 0 2.48 30 30.98 60 − 2.16
19 90 0 2.33 30 31.89 − 1.89 60
20 87 0 2.48 30 32.98 60 − 2.56
21 78 0 2.43 30 31.87 60 − 9.99
22 71 0 2.43 30 31.87 60 − 20
23 52 0 2.09 30 30.99 − 27.13 60
24 50 0 1.49 30 27.99 − 30 60