Table 4.

Optimal generation schedule for minimization of operating cost and emission (Case-I).

Hour Pd(kW) Ppv(kW) Pwt(kW) Pmt(kW) PFC(kW) PBatt(kW) Pgrid(kW)
1 52 0 0 13.87 25.32 − 4.52 17.32
2 50 0 0 17.33 22.83 10.25 − 0.41
3 50 0 0 11.92 26.11 0.42 11.55
4 51 0 0 7.89 20.86 − 0.63 22.87
5 56 0 0 20.93 20.25 5.91 8.91
6 63 0 0 12.84 29.55 4.59 16.02
7 70 0 0 24.83 30 9.54 5.63
8 75 0 0 20.32 27.95 11.82 14.91
9 76 0 1.57 23.78 30 13.99 6.66
10 80 12.13 3.24 30 30 27.84 − 23.21
11 78 12.13 8.42 27.45 30 30 − 30
12 74 4.51 11.22 27.33 30 29.91 − 28.97
13 72 1.24 1.63 28.57 29.78 28.21 − 17.43
14 72 7.85 4.16 30 29.98 30 − 29.99
15 76 1.45 2.33 28.31 30 30 − 16.09
16 80 1.15 0.55 28.31 28.18 28.36 − 6.55
17 85 2.31 0 20.23 30 19.13 13.33
18 88 0 0 22.35 30 11.43 24.22
19 90 0 0 21.14 25.87 21.17 21.82
20 87 0 0 24.97 29.98 4.93 27.12
21 78 0 0 21.32 29.92 30 − 3.24
22 71 0 0 23.14 27.46 24.69 − 4.29
23 52 0 0 14.56 20.45 4.12 12.87
24 50 0 0 20.05 19.32 4.51 6.12