Optimal generation schedule for minimization of operating cost and emission (Case-II).

Hour Pd(kW) Ppv(kW) Pwt(kW) Pmt(kW) PFC(kW) PBatt(kW) Pgrid(kW)
1 52 0 15 24.0394 7.4902 − 24.5295 30
2 50 0 15 12.9382 22.0562 − 29.9921 30
3 50 0 15 29.984 19.05328 − 30 15.9641
4 51 0 15 22.1806 14.9835 − 30 28.8297
5 56 0 15 29.9752 12.6371 − 30 28.3875
6 63 0 15 29.9806 29.9812 − 30 18.0382
7 70 0 15 29.9997 24.9988 − 30 30
8 75 0.263 15 29.9542 29.9732 − 30 29.813
9 76 3.26 15 27.5054 29.9239 30 − 29.6893
10 80 7.603 15 29.9231 4.7821 30 − 7.3029
11 78 11.289 15 29.8834 29.2381 16.8032 − 24.2131
12 74 14.093 15 12.0971 30 30 − 27.1892
13 72 24.752 15 29.9837 30 2.2645 − 30
14 72 23.198 15 10.2093 15.3921 18.9835 − 10.7824
15 76 8.0732 15 27.3891 22.0891 30 − 27.5498
16 80 6.309 15 29.6034 29.1138 29.7023 − 29.7213
17 85 1.752 15 29.5402 30 30 − 21.2874
18 88 0 15 29.7835 30 30 − 16.7832
19 90 0 15 22.6131 30 − 15 22.3891
20 87 0 15 28.0372 30 30 − 16.0348
21 78 0 15 29.6608 30 30 − 26.6608
22 71 0 15 30 30 25.9874 − 29.9874
23 65 0 15 30 20 − 29.9752 29.9752
24 56 0 15 30 12.9098 28.0733 − 29.9823