Skip to main content
. 2024 Jul 19;13(14):e70003. doi: 10.1002/cam4.70003

FIGURE 1.

FIGURE 1

Hypothesized model of post‐appointment uncertainty (A) and results of the full path model for post‐appointment uncertainty (B). Parameter estimates are standardized. Solid lines in Figure 1A, B represent significant paths at p < 0.01 (designated with *). Dashed lines represent paths with significance at p > 0.05. (B) Model fit indices were χ 2 (4) = 4.29, p = 0.37; RMSEA = 0.04; CFI = 0.99; SRMR = 0.07.