Skip to main content
. 2024 Jul 10;26(7):590. doi: 10.3390/e26070590

Table 3.

Analysis of computation costs for different schemes.

Scheme MS MV Trace Revoke
[22] 2T+2Tem+4Th 2T+2Tem+7Th - Revocation list
[24] Th+4Tbp+4Tbpe2+6Te+9Tm Th+2Tm+4Tbpe2+5Tbp+8Te Tbpe1 Revocation list
[26] 2Th+5Tbpe1 Ti+Tbpe1+Tbpe2+Th+TDE+Tbpm2+3Tbp O(1) Revocation list
[37] T+2Th+3Tmtp+4Tbpm1+6Tbpe1 T+Tbpm1+2Th+3Tbpe1+3Tbpm2+5Tbp+5Tmtp TDE -
[38] 2Th+2Tea+3Tm+6Tem Th+3Tem+4Tea Tem+Tea Revocation list
Ours T+Ti+2Tem+4Tm+4Th 3Th+3Tea+4Tem Th+T Tmod