Skip to main content
. 2024 Jul 15;16(7):3026–3035. doi: 10.62347/DCLG9825

Table 2.

Patient surgical success rate and bone cement leakage

Project n=125
Surgery success rate 125 (100.00)
Surgical time (min) 54.89±4.03
Bone cement leakage
    Leakage anterior to cone 7 (5.60)
    Cone side leakage 4 (3.20)
    Leakage behind the cone 0
Bleeding volume (ml) 6.92±1.27
Hospital stay (days) 8.61±1.18